Serving Lincoln County for more than a century!
PUBLIC NOTICE
Lincoln County Dept. of Public
Works, 27234 State Route
25N, Davenport, Washington
99122, is seeking coverage
under the Washington State
Department of Ecology’s Construction
Stormwater, NPDES
and State Waste Discharge
General Permit.
The proposed projects, known
as the Miles Creston Road
Section 1 & 1B, County Road
Projects G-1034 & G-1035,
are located between M.P. 0.00
and 3.01 for section 1 and M.P.
3.01 and 4.66 for section 1B on
Miles Creston Road No. 95100.
The project begins at the intersection
of Miles Creston Road
and State Highway 2, approximately
1.8 miles Southeast of
Creston, Washington in Lincoln
County, and extends 4.66 to
the intersection of Copenhaver
Rd. 51410
These projects involve approximately
18 acres of soil
disturbance to provide areas for
road expansion and equipment
storage. Project activities will
include: Remove the existing
asphalt surface; Install new
drainage pipes; Install guardrail;
Resurface approach roadway
with crushed and asphaltic surfacing
material; Reclamation of
all areas disturbed.
Any potential for discharge
resulting from construction and
project area to natural drainage
channels or Welch Creek
will be controlled by the Best
Management Practices (BMP’s)
practicable, using the Stormwater
Management Manual
for Eastern Washington as a
guide. BMP’s may include but
not necessarily be limited to the
following:
Work performed will be at
low flow in the dry periods of
summer
Preserve Natural Vegetation,
Grass Lined Channels and
Buffer Zones
Stabilize Construction Entrances
and Road/Parking Areas
Temporary and Permanent
Seeding upon completion of
project
Any person(s) desiring to present
their views to the Washington
State Department of Ecology
regarding
this application, or interested
in Ecology’s action on this application,
may notify Ecology
in writing no later than 30 days
of the last date of publication
of this notice. Ecology reviews
public comments and considers
whether discharges from this
project would cause a measurable
change in receiving water
quality, and, if so, whether the
project is necessary and in the
overriding public interest according
to Tier II antidegradation
requirements under WAC 173-
201A-320. Publication dates of
this notice are March 13, 2024,
and March 20, 2024.
Comments can be submitted to:
Department of Ecology
Attn: Water Quality Program,
Construction Stormwater
P.O. Box 47696
Olympia, WA 98504-7696
Published March 14 and 21,
2024
Reader Comments(0)